RE: Solar power project step 3, circuit designs for charging / power out switch for continuous(ish) use, and new batteries by smithlabs

View this thread on: d.buzz | hive.blog | peakd.com | ecency.com

Viewing a response to: @smithlabs/re-fourth-solar-power-project-step-3-circuit-designs-for-charging-power-out-switch-for-continuous-ish-use-and-new-batteries-20180805t013431735z

·@fourth·
0.000 HBD
Hi @smithlabs, listen thanks a lot for your comment, I took a break from social media for a while so I am only seeing this now. Thanks! I developed the system a bit further so I'm planning on posting about that in the next few days.

You know what you made me realise with this post, that the draw doesn't stop at whatever the rating is at 1 hour! I just made a mental error that it would _at most_ give 7 amps, not that that would ramp up massively to meet the draw. So thanks.
👍 ,