Monitoring the water duct work in the sphere of North Aceh Regency
project·@irvanhelmi·
0.000 HBDMonitoring the water duct work in the sphere of North Aceh Regency
Hello everything is back again with me On this occasion I will tell you about our oversight work on a project for the construction of in North Aceh Regency. <hr>  <hr>  <hr> A development project will achieve success if there is a reliable surveillance against the course of a development project that was implemented. Then how should a good oversight that will run. <hr>  <hr>  <hr>  <hr> In a project required a project control systems that would be expected in the implementation of the project is always in the direction of the objective to be achieved. The control also aims to assist in the determination of the Manager's activities and the achievement of something. Control is not a tool that shows the lack of a job. Monitoring is a first step rather than controlling the implementation of the project. With the monitor schedules and cost then we can find out how large the deviation cost and also schedule between the plan and the implementation of the project at the time reported. <hr>  <hr>  <hr> In a project needed a project management system which is expected in the implementation of the project is always in the direction of the goal. Monitoring is the first step of controlling the implementation of the project. In order for monitoring running maximum can use the concept of the value of the results. Earned value method is a method of integrating the relationship between cost and time as well as the relationship between time, cost and progress of project implementation which also describes the condition of the continuity of the current project reporting. Thus the concept aims to determine the value of the anticipatory measures that can be taken when a deviation occurs either at the time of project implementation as well as on the Irrigation Channel projects contained in two locations in North Aceh. <hr>  <hr>  <hr> The architect focuses on the concept and character of the building, its contents are about sporting sense, it functions & aesthetics. That was on his head is a form/composition of space inside and out, if anything it's just the technical concept of the whole. Supervision of more or less the same things over at Yes. Usually when buildings have already entered the stage of finishing is then the role of the architect is clearly visible, because it appears the problem of texture, colour and type of material eventually. Now less is more so on matters related to the supervision of the project that is seen from the architecture. Hope this post could be an enlightenment to us all. <html> <p><center><strong><h2>Please vote, comment and even resteem! Your support me</h2></strong></center></p> <center></center>
👍 mmmmkkkk311, irvanhelmi, rabiagilani, joeyarnoldvn, sbi6, coolguy123, demo, esteem.app, good-karma, feruz, mysteem, esteemapp, steeimran, bluemoon, whyerror, novaliamarja, auzimirza33, jaroot, cutnazla, wahyudios, wawanhagu, levycore, fajar.perangin79, putri.nova, rahma.dina, upvoteph, poetsunit, steemitboard,