Amur bridge. The section of the Amur remained unaffected, which interrupted the metal str

View this thread on: d.buzz | hive.blog | peakd.com | ecency.com
·@yurymorozov·
0.000 HBD
Amur bridge. The section of the Amur remained unaffected, which interrupted the metal str
Amur bridge.  The section of the Amur remained unaffected, which interrupted the metal strips of the Trans-Siberian Railway.  There was only a temporary crossing: in summer - by ferries, in winter - on rails laid directly on the river ice.

 The engineers thought about the technology of building the bridge twenty years before the actual construction.  As a result, outstanding bridge builders and scientists in the field of structural mechanics took up the creation of the project: Lavr Dmitrievich Proskuryakov and Grigory Petrovich Perederiy. 
 ![](https://somee.social/download/5501076a-bb53-44bb-91db-e267f95ab2de)
👍 , , , , , , ,